Setting up Comet-ME wind turbine

Hi,

I am planning on setting a wind turbine in my parents house in Har-Adar. In EWB We made a turbine with the guiding of Comet-ME course. I went down to where they live and work to see how they set up the pole on which the turbine sits.

The Arab village around here have no water supply nor electricity, unlike the Israeli settlements. Those, as illegal and some as they are have it all. Those wind turbine produce and provide some electricity for the those villages.

Comet-ME center in the Southern hills of Mount Hebron

Comet-ME center in the Southern hills of Mount Hebron

On the ridge above the center you can already see many turbine spinning in speed.

On the ridge above the center you can already see many turbine spinning in speed.

Near the center the base of the pole is ready installed in the ground.

Near the center the base of the pole is ready installed in the ground.

The valley below the center, typical view of this area.

The valley below the center, typical view of this area.

The water supply here, in the Arab villages called "Hirbe" (="ruins"), is based on cistern and wells

The water supply here, in the Arab villages called “Hirbe” (=”ruins”), is based on cistern and wells

Goats are sheep herds can be seen all over the area, and they are one of the main occupation of the people here.

Goats are sheep herds can be seen all over the area, and they are one of the main occupation of the people here.

Comet-ME center building. An ecological building - Made of mud and straw, gather water on the roof tank and in the cistern, and produce electricity by using solar panels on the roof. Very soon it will also have a wind turbine on its side.

Comet-ME center building. An ecological building – Made of mud and straw, gather water on the roof tank and in the cistern, and produce electricity by using solar panels on the roof. Very soon it will also have a wind turbine on its side.

Another view

Another view

From within

From within

The wind turbine body, home made by Comet-ME.

The wind turbine body, home made by Comet-ME.

The cave below the building is used to hold the batteries (on the right) and the electrical panels.

The cave below the building is used to hold the batteries (on the right) and the electrical panels.

It is also used to store equipment and dwelling area.

It is also used to store equipment and dwelling area.

From another angle.

From another angle.

As we were working, Jet fighters kept tumbling the air above us. It seems it is a preferred route for the pilots.

As we were working, Jet fighters kept tumbling the air above us. It seems it is a preferred route for the pilots.

A construction for future solar panels.

A construction for future solar panels.

A model of the turbine mast, used to explain how it being raised.

A model of the turbine mast, used to explain how it being raised.

The base of the mast was installed in advance. It is anchored into the rock using epoxy anchors.

The base of the mast was installed in advance. It is anchored into the rock using epoxy anchors.

To the side of the base the electricity box is installed.

To the side of the base the electricity box is installed.

The anchors for the cables of the mast also pre-installed

The anchors for the cables of the mast also pre-installed

The base and the electricity box from the other side

The base and the electricity box from the other side

The longer pole of the mast. In the shadow the shorter pole can be seen.

The longer pole of the mast. In the shadow the shorter pole can be seen.

The shorter pole being installed

The shorter pole being installed

The cables

The cables

The winch to pull up the mast

The winch to pull up the mast

Connecting the mast to the base

Connecting the mast to the base

Securing the cables with omega

Securing the cables with omega

Securing the bolts of the mast

Securing the bolts of the mast

Securing the bolts of the mast

Connecting the cables to the top of the shorter pole

Setting up the shorter pole

And the shorter pole is up. It used as a lever to pull up the mast of the turbine.

And the shorter pole is up. It used as a lever to pull up the mast of the turbine.

Lifting the mast up

Lifting the mast up

Pulling up the mast

Pulling up the mast

Pulling up the mast

The mast is going up!

From a different angle

From a different angle

The mast is up!

The mast is up!

Securing the cables

Securing the cables

Securing the cables

Releasing the winch

Releasing the winch

Visitors from around watching the show

Visitors from around watching the show

Visitors from around watching the show

Last checks and connections in the turbine body

Last checks and connections in the turbine body

Fastening the bolts of the wings

Fastening the bolts of the wings

The wings waiting to be installed

The wings waiting to be installed

Connecting the cables of the turbine

Connecting the cables of the turbine

And the cables to the electric box

And the cables to the electric box

Taking down the mast to install the mast

Taking down the mast to install the mast

And it's down

And it’s down

Bringing the turbine body

Bringing the turbine body

Install the turbine body on the mast

Install the turbine body on the mast

Connecting the cables to the turbine body

Connecting the cables to the turbine body

Installing the tail of the turbine

Installing the tail of the turbine

Installing the wings

Installing the wings

The wings are on

The wings are on

Fastening the bolts

Fastening the bolts

And the army is also interested in what's happening

And the army is also interested in what’s happening

Taking up the mast on the second time


And it’s  spinning!

 

The cables are hold in case the turbine will need to be

The cables are hold in case the turbine will need to be

The turbine on the top of the mast

The turbine on the top of the mast

And the electricity is running! =)

And the electricity is running! =)

 

Take Care
Gad